{"id":14755,"date":"2026-05-22T12:55:33","date_gmt":"2026-05-22T12:55:33","guid":{"rendered":"https:\/\/sollab.pl\/?p=14755"},"modified":"2026-05-22T12:55:33","modified_gmt":"2026-05-22T12:55:33","slug":"photovoltaics-and-fire","status":"publish","type":"post","link":"https:\/\/sollab.pl\/en\/fotowoltaika-a-pozar\/","title":{"rendered":"Photovoltaics and fire: what to fear and what not to fear?"},"content":{"rendered":"<p><em>Social media is awash with headlines like \u201ephotovoltaics cause fires\u201d. It's a topic that stirs emotions - and is often deliberately exaggerated. As a company that has installed more than 1,000 installations in Pomerania and services them, we have our opinions based on facts, not headlines.<\/em><\/p>\n<h2>First the numbers - without them the conversation is pointless<\/h2>\n<p>The State Fire Service in Poland does not keep separate statistics on fires caused by photovoltaics. It only records incidents where there was a PV installation in the facility - which does not mean that it was the cause of the fire. This is an important distinction that gets lost in alarmist articles.<\/p>\n<div style=\"overflow-x: auto; margin: 24px 0;\">\n<table style=\"width: 100%; border-collapse: collapse; font-size: 14px; font-family: 'Open Sans', sans-serif;\">\n<tbody>\n<tr style=\"background: #fdf3e7;\">\n<td style=\"padding: 16px; text-align: center; border: 1px solid #f5e0c0;\">\n<p style=\"font-family: 'Krub', sans-serif; font-size: 26px; font-weight: 800; color: #ed8c1c; margin: 0 0 4px;\">411<\/p>\n<p style=\"font-size: 13px; color: #555; margin: 0;\">incidents involving PV recorded by the PSP between 2018 and 2021<\/p>\n<\/td>\n<td style=\"padding: 16px; text-align: center; border: 1px solid #f5e0c0;\">\n<p style=\"font-family: 'Krub', sans-serif; font-size: 26px; font-weight: 800; color: #ed8c1c; margin: 0 0 4px;\">128<\/p>\n<p style=\"font-size: 13px; color: #555; margin: 0;\">cases where the PSP confirmed the link of the fire directly to the PV installation<\/p>\n<\/td>\n<td style=\"padding: 16px; text-align: center; border: 1px solid #f5e0c0;\">\n<p style=\"font-family: 'Krub', sans-serif; font-size: 26px; font-weight: 800; color: #ed8c1c; margin: 0 0 4px;\">&lt;0.05%<\/p>\n<p style=\"font-size: 13px; color: #555; margin: 0;\">contribution of PV installations to fire incidents with more than 1.5 million micro-installations<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p style=\"font-size: 12px; color: #888;\">Sources: Fire Review of the KG PSP, firefighter survey (2022), Globenergia based on data from the KCKS PSP<\/p>\n<p>For perspective: during the 2025\/2026 heating season, firefighters intervened with chimney fires more than 12,700 times - that's an average of 50 interventions per day. Meanwhile, fires directly involving PV are a few dozen cases per year nationwide. Statistically, a house with PV is no more likely to catch fire than a house without it.<\/p>\n<div style=\"background: #fff8f0; border-left: 4px solid #ed8c1c; border-radius: 0 8px 8px 0; padding: 20px 24px; margin: 24px 0; font-family: 'Open Sans', sans-serif;\">\n<p style=\"font-size: 14px; color: #444; line-height: 1.7; margin: 0;\"><strong>A key difference that the media is silent about:<\/strong> A high-profile building fire in Z\u0105bki in July 2025 was attributed on social media to PV panels. The PSP confirmed: there was no PV at all on the building involved in the fire. The panic was a few days ahead of the facts.<\/p>\n<\/div>\n<h2>Where then do PV installation fires come from?<\/h2>\n<p>When a fire actually occurs - and it does happen - the causes are well researched. Studies by T\u00dcV Rheinland and the Fraunhofer Institute indicate that more than 70% cases are due to external influences or installation errors. Equipment failure alone accounts for just 17%, inverter failure for 10%.<\/p>\n<div style=\"overflow-x: auto; margin: 20px 0;\">\n<table style=\"width: 100%; border-collapse: collapse; font-size: 14px; font-family: 'Open Sans', sans-serif;\">\n<thead>\n<tr style=\"background: #ed8c1c; color: #fff;\">\n<th style=\"padding: 12px 16px; text-align: left; font-weight: bold;\">Cause of fire in PV installations<\/th>\n<th style=\"padding: 12px 16px; text-align: center; font-weight: bold;\">Share according to T\u00dcV\/PSP<\/th>\n<th style=\"padding: 12px 16px; text-align: left; font-weight: bold;\">Example from SolLab practice<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr style=\"background: #fdf3e7;\">\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0;\">Installation errors (MC4 connectors, cable cross sections)<\/td>\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0; text-align: center; font-weight: bold; color: #c0392b;\">~40%<\/td>\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0;\">Mismatched MC4 connectors from different manufacturers - arcing<\/td>\n<\/tr>\n<tr style=\"background: #fff9f2;\">\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0;\">External factors (lightning, rodents, mechanical damage)<\/td>\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0; text-align: center; font-weight: bold; color: #c0392b;\">~30%<\/td>\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0;\">Martens chew through cables under panels - short circuit 2 years after installation<\/td>\n<\/tr>\n<tr style=\"background: #fdf3e7;\">\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0;\">Hotspots (overheated cells, dirt)<\/td>\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0; text-align: center; font-weight: bold;\">~13%<\/td>\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0;\">Leaves and bird droppings on panels - local overheating up to 200\u00b0C<\/td>\n<\/tr>\n<tr style=\"background: #fff9f2;\">\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0;\">Failure of inverter or DC equipment<\/td>\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0; text-align: center; font-weight: bold;\">~10%<\/td>\n<td style=\"padding: 11px 16px; border-bottom: 1px solid #f5e0c0;\">Inverter without CE certificate - spontaneous ignition in electrical cabinet<\/td>\n<\/tr>\n<tr style=\"background: #fdf3e7;\">\n<td style=\"padding: 11px 16px;\">Design errors (poor choice of safeguards)<\/td>\n<td style=\"padding: 11px 16px; text-align: center; font-weight: bold;\">~7%<\/td>\n<td style=\"padding: 11px 16px;\">No surge protection on the installation<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p style=\"font-size: 12px; color: #888;\">Sources: T\u00dcV Rheinland \/ Fraunhofer ISE, PSP Fire Review, SolLab's own observations from service reviews<\/p>\n<div style=\"background: #fff8f0; border-left: 4px solid #ed8c1c; border-radius: 0 8px 8px 0; padding: 20px 24px; margin: 24px 0; font-family: 'Open Sans', sans-serif;\">\n<p style=\"font-size: 14px; color: #444; line-height: 1.7; margin: 0;\"><strong>What follows from our service practice in Pomerania:<\/strong> Over 14 years we have serviced installations on coastal roofs, where salty air and high winds accelerate the degradation of connectors. The most common problem we detect during inspections is loose or oxidised MC4 connectors - which are invisible without thermal imaging inspection, but can lead to arcing. The second most common is damage by martens, which are particularly active in Pomerania.<\/p>\n<\/div>\n<h2>Photovoltaics and fire - legal obligations you can't ignore<\/h2>\n<p>Many people do not know that the building law imposes specific obligations on owners of PV installations above 6.5 kW:<\/p>\n<ul>\n<li><strong>Project agreement<\/strong> with a fire protection expert - prior to installation<\/li>\n<li><strong>Notification to the competent<\/strong> of the district fire marshal on the completion of construction work<\/li>\n<li><strong>Mandatory DC fire switch<\/strong> (fire safety switch), which cuts off the voltage on the panel side - the main switch does not do this, because the panels generate direct current as long as the sun shines.<\/li>\n<\/ul>\n<div style=\"background: #fdf3e7; border-radius: 8px; padding: 20px 24px; margin: 24px 0; font-family: 'Open Sans', sans-serif;\">\n<p style=\"font-family: 'Krub', sans-serif; font-weight: bold; font-size: 15px; color: #212121; margin: 0 0 10px;\">\u26a1 Note - DC voltage does not disappear when power is switched off<\/p>\n<p style=\"font-size: 14px; color: #444; line-height: 1.7; margin: 0 0 12px;\">Switching off the power supply on the grid side does not switch off the DC voltage on the panel side. Even with the inverter cut off, the cables between the panels and the inverter can have a voltage of 300-900 V DC as long as the sun is shining.<\/p>\n<p style=\"font-size: 14px; color: #444; line-height: 1.7; margin: 0;\"><strong>Exception - SolarEdge system with power optimisers:<\/strong> When the mains power is switched off, the DC voltage in the wiring automatically drops below 1 volt - a safe level for humans. Firefighters can climb onto the roof without risk of shock. This is the SafeDC function, certified by IEC 62109. <a href=\"https:\/\/sollab.pl\/en\/solaredge-system-increased-output-and-safety\/\">Read more about the SolarEdge system \u2192<\/a><\/p>\n<\/div>\n<h2>How to check if your photovoltaic installation is safe?<\/h2>\n<p>Ask yourself a few questions - if you answer \u201eI don't know\u201d to any of them, it's a signal that it's worth ordering a review:<\/p>\n<div style=\"overflow-x: auto; margin: 20px 0;\">\n<table style=\"width: 100%; border-collapse: collapse; font-size: 14px; font-family: 'Open Sans', sans-serif;\">\n<tbody>\n<tr style=\"background: #f0fff4;\">\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #d5f5e3; width: 40px; text-align: center; font-size: 18px;\">\u2705<\/td>\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #d5f5e3;\">Was the installation installed by a UDT or SEP-certified company?<\/td>\n<\/tr>\n<tr style=\"background: #f0fff4;\">\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #d5f5e3; text-align: center; font-size: 18px;\">\u2705<\/td>\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #d5f5e3;\">Is the inverter CE certified and from an authorised distributor?<\/td>\n<\/tr>\n<tr style=\"background: #f0fff4;\">\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #d5f5e3; text-align: center; font-size: 18px;\">\u2705<\/td>\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #d5f5e3;\">Does the installation have a DC fire circuit breaker (required for &gt;6.5 kW)?<\/td>\n<\/tr>\n<tr style=\"background: #f0fff4;\">\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #d5f5e3; text-align: center; font-size: 18px;\">\u2705<\/td>\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #d5f5e3;\">Has a thermal imaging survey of MC4 fittings been carried out within the last 2 years?<\/td>\n<\/tr>\n<tr style=\"background: #fff5f5;\">\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #fad7d7; text-align: center; font-size: 18px;\">\u274c<\/td>\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #fad7d7;\">Is the installation more than 5 years old without any technical inspection?<\/td>\n<\/tr>\n<tr style=\"background: #fff5f5;\">\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #fad7d7; text-align: center; font-size: 18px;\">\u274c<\/td>\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #fad7d7;\">Do you see scorch marks, discolouration or smell burning at the inverter?<\/td>\n<\/tr>\n<tr style=\"background: #fff5f5;\">\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #fad7d7; text-align: center; font-size: 18px;\">\u274c<\/td>\n<td style=\"padding: 12px 16px; border-bottom: 1px solid #fad7d7;\">Do you know if martens or birds may be nesting under the panels?<\/td>\n<\/tr>\n<tr style=\"background: #fff5f5;\">\n<td style=\"padding: 12px 16px; text-align: center; font-size: 18px;\">\u274c<\/td>\n<td style=\"padding: 12px 16px;\">Have the panels not been cleaned for over a year and are showing dirt?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>What to do in the event of a fire - knowledge you hope not to use<\/h2>\n<ol>\n<li><strong>Call 112<\/strong> - and immediately inform the dispatcher that the building has a photovoltaic installation. Firefighters need to be aware of the presence of DC voltage even before they get on the roof.<\/li>\n<li><strong>Do not extinguish with water<\/strong> panels or live DC cables - risk of electrocution. If you have a powder extinguisher (min. 4 kg), you can extinguish from a distance of at least 1 metre.<\/li>\n<li><strong>Walk away from the building<\/strong> - do not attempt to disconnect the installation yourself. Switching off the meter or the main fuse does not cut off the DC voltage between the panels and the inverter.<\/li>\n<\/ol>\n<div style=\"background: #fff8f0; border-left: 4px solid #ed8c1c; border-radius: 0 8px 8px 0; padding: 20px 24px; margin: 24px 0; font-family: 'Open Sans', sans-serif;\">\n<p style=\"font-size: 14px; color: #444; line-height: 1.7; margin: 0;\">Extinguishers certified for extinguishing PV installations are available on the market: <strong>Stop PV<\/strong> i <strong>SOLARSTOP<\/strong> CNBOP-certified. They make it possible to extinguish modules and wiring with voltages up to 1,000 V. It is worth having one on hand, especially if the inverter is located in a garage or boiler room. More about the safety of electrical installations in Poland is published in <a href=\"https:\/\/www.gov.pl\/web\/psp\" target=\"_blank\" rel=\"noopener nofollow\">National Fire Service<\/a>.<\/p>\n<\/div>\n<h2>Summary - calm but not carefree<\/h2>\n<p>Photovoltaics are safe - the statistics prove it. The risk of fire with a properly installed and serviced installation is marginal: less than 0.05% of installations in Poland had any connection to a fire event. This is less than the risk of fire from an outdated electrical installation or a leaking chimney.<\/p>\n<ul>\n<li><strong>PV fire risk is marginal<\/strong> when installed by a certified company<\/li>\n<li><strong>Most common causes: installation errors and external factors<\/strong> - both are detectable during inspection<\/li>\n<li><strong>Installations &gt;6.5 kW have a legal obligation<\/strong> notification to the Fire Brigade and agreement with the fire officer.<\/li>\n<li><strong>Thermal imaging inspection every 2-3 years<\/strong> is the most effective prevention<\/li>\n<li><strong>In case of fire:<\/strong> 112, PV information, do not extinguish with water, do not disconnect by yourself<\/li>\n<\/ul>\n<div style=\"border: 2px solid #ed8c1c; border-radius: 10px; padding: 28px; margin: 32px 0; background: #fdf3e7; font-family: 'Open Sans', sans-serif; text-align: center;\">\n<p style=\"font-family: 'Krub', sans-serif; font-weight: bold; font-size: 18px; color: #212121; margin: 0 0 12px;\">Technical inspection and thermal imaging of PV installations - Sollab Gdansk<\/p>\n<p style=\"font-size: 14px; color: #444; line-height: 1.7; margin: 0 0 16px;\">We service photovoltaic installations in Pomerania regardless of who installed them. We check the MC4 connectors, the condition of the inverter, the DC protection and any traces of hot-spots with a thermal imaging camera. After the inspection, you receive a written report with an assessment of the technical condition.<\/p>\n<p>Gda\u0144sk - Gdynia - Sopot - Wejherowo - Kartuzy - Tczew - Pruszcz Gda\u0144ski - and the entire Pomeranian region<\/p>\n<p><a style=\"display: inline-block; background: #ed8c1c; color: #fff; padding: 12px 28px; border-radius: 6px; font-weight: bold; font-size: 15px; text-decoration: none; font-family: 'Krub', sans-serif;\" href=\"\/en\/contact\/\">Make an appointment for an inspection \u2192 +48 608 435 001<\/a><\/p>\n<\/div>\n<h2>FAQ - frequently asked questions about photovoltaics and fires<\/h2>\n<div>\n<div>\n<h3>Can photovoltaics cause a fire?<\/h3>\n<div>\n<p>Yes, but the risk is very low. According to PSP data, less than 0.05% of installations in Poland had any connection to a fire event. The most common cause is installation errors and mechanical damage - not the photovoltaic technology itself.<\/p>\n<\/div>\n<\/div>\n<div>\n<h3>What is the most common cause of a photovoltaic installation fire?<\/h3>\n<div>\n<p>More than 70% of cases are due to installation errors (MC4 connectors, poorly sized cable cross sections) or external factors such as lightning or rodent damage. Equipment failure is only about 17% cases.<\/p>\n<\/div>\n<\/div>\n<div>\n<h3>How do I check if my photovoltaic installation is safe?<\/h3>\n<div>\n<p>The most effective method is a thermal imaging survey - this can detect overheated joints and hot-spots on panels before they become a hazard. It is recommended to perform it every 2-3 years or after every severe storm.<\/p>\n<\/div>\n<\/div>\n<div>\n<h3>Does switching off the main fuse disable the PV?<\/h3>\n<div>\n<p>No. The panels generate direct current (DC) as long as the sun is shining - regardless of the main switch. The cables between the panels and the inverter remain at 300-900 volts DC. Therefore, in the event of a fire, always inform the fire brigade of the presence of a photovoltaic installation.<\/p>\n<\/div>\n<\/div>\n<div>\n<h3>How often do I need to have my photovoltaics serviced?<\/h3>\n<div>\n<p>Manufacturers and installers recommend servicing every 2-3 years. Installations older than 5 years without any service are most prone to problems with connectors and DC wiring.<\/p>\n<\/div>\n<\/div>\n<div>\n<h3>Does a photovoltaic installation over 6.5 kW require notification to the fire brigade?<\/h3>\n<div>\n<p>Yes. In accordance with the building regulations, PV installations above 6.5 kW require the agreement of a fire protection expert and notification to the competent district fire marshal upon completion of the installation.<\/p>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Social media is awash with headlines like \u201ephotovoltaics cause fires\u201d. It's a topic that stirs emotions - and is often deliberately exaggerated. As a company that has installed more than 1,000 installations in Pomerania and services them, we have our opinions based on facts, not headlines. First the figures - without them the conversation is pointless The National Fire Service ...<\/p>","protected":false},"author":5,"featured_media":14760,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"default","_kad_post_title":"default","_kad_post_layout":"default","_kad_post_sidebar_id":"","_kad_post_content_style":"default","_kad_post_vertical_padding":"default","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","description":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-14755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"acf":[],"taxonomy_info":{"category":[{"value":1,"label":"Blog"}]},"featured_image_src_large":["https:\/\/sollab.pl\/wp-content\/uploads\/2026\/05\/fotowoltaika-a-pozar-1024x768.png",1024,768,true],"author_info":{"display_name":"biuro","author_link":"https:\/\/sollab.pl\/en\/author\/biuro\/"},"comment_info":0,"category_info":[{"term_id":1,"name":"Blog","slug":"blog","term_group":0,"term_taxonomy_id":1,"taxonomy":"category","description":"","parent":0,"count":130,"filter":"raw","cat_ID":1,"category_count":130,"category_description":"","cat_name":"Blog","category_nicename":"blog","category_parent":0}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/posts\/14755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/comments?post=14755"}],"version-history":[{"count":2,"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/posts\/14755\/revisions"}],"predecessor-version":[{"id":14762,"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/posts\/14755\/revisions\/14762"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/media\/14760"}],"wp:attachment":[{"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/media?parent=14755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/categories?post=14755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sollab.pl\/en\/wp-json\/wp\/v2\/tags?post=14755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}